| Design for LEED certification can be a
great challenge for architects and the design team. Geiler
& Associates, LLC emphasizes solutions tailored to the
client’s needs while at the same time keeping track
of the specific requirements for LEED accreditation. Geiler
& Associates personnel are also experienced with the CO-CHPS
benchmark for high-performance school design. The results
of our attention are cost effective Acoustics and AV solutions
with a focus on efficient, healthy and green design. |
-
Bethke Elementary School
LEED Gold Certified
Timnath , Colorado
Facility includes gymatorium and vocal & music rooms
as well as classrooms, conference rooms and offices. Responsibilities
included interior acoustics, sound isolation and mechanical
noise & vibration mitigation design.
Recieved
a Gold Medal from The Building of America
Architect: RB+B Architects
Fort Collins, Colorado |
Casey Middle School
Pending LEED Silver Certification
Boulder , Colorado
Facility includes auditorium and vocal & music rooms
as well as classrooms, conference rooms and offices. Responsibilities
included theatrical rigging & drapery design, interior
acoustics, sound isolation and mechanical noise & vibration
mitigation design.
Architect: RB+B Architects
Fort Collins, Colorado
|
| Fort Carson Band Training Facility
LEED Gold Certified
Fort Carson, Colorado

Provided Space Planning, Interior Acoustic Design, Sound
Insulation Design and Mechanical Noise & Vibration Control
for Recording/Practice Studios.
Read about the band training facility in the Colorado
Springs Gazette and the Colorado
Springs Military News.
Client: DLR Group
Colorado Springs, Colorado
|
Crested Butte Community School Addition
Pending LEED Silver Certification
Crested Butte, Colorado
Facility includes music rooms as well as classrooms, conference
rooms and offices. Responsibilities included interior acoustics,
sound isolation and mechanical noise & vibration mitigation
design.
Architect: Blythe Design + Co.
Architects Grand Junction, Colorado
|
Discovery World
LEED Gold Certified
Milwaukee, Wisconsin
Discovery World at Pier Wisconsin is Milwaukee's exciting
youth-oriented science, technology and freshwater resources
museum. Located on the shore of Lake Michigan in downtown
Milwaukee, the sustainably designed, 120,000 SF building
is a light and luminous presence, clad in white high-density
resin panels and composed of two volumes.
Geiler & Associates, LLC provided architectural acoustics,
audio & video, noise and vibration design services for
the entire complex. The facility includes a high definition
digital theater, theatrical theater, audio recording studio
and TV studio as well as various exhibits and small presentation
systems. The high definition digital theater includes capability
for high definition satellite video conferencing. The audio
and video systems for the facility are interconnected via
fiber optic and Ethernet control and data transfer systems.
Architect: HGA, Inc.
Milwaukee, Wisconsin
|
Tom Ridge Environmental Center
LEED Silver Certified
Erie, Pennsylvania
The gateway to a new state park on the unique Presque
Isle peninsula, this 58,000-SF multi-use visitor's center
includes educational exhibits, space for government and
educational administration, and laboratories. The building
and landscape design ensure that the project embodies the
very sustainable principles it is envisioned to further.
The facility includes a 300+ seat multipurpose auditorium
with an 8/70 large format cinema. Geiler & Associates,
LLC provided auditorium acoustics, sound isolation, noise
& vibration Control and audio & video design for
the auditorium.
Recieved
the 2006 Commonwealth Design Award from 10,000 Freinds of
Pennsylvania
Architect: Wallace Todd Roberts
Philidelphia, Pennsylvania
Client: State of Pennsylvania
Harrisburg, Pennsylvania
|
St. Vrain Elementary School
Pending LEED Certification
St. Vrain, Colorado
Facility includes music rooms as well as classrooms, conference
rooms and offices. Responsibilities included interior acoustics,
sound isolation and mechanical noise & vibration mitigation
design.
Architect: RB+B Architects
Fort Collins, Colorado |
Western State College Taylor Hall
Pending LEED Gold Certification
Gunnison, Colorado
Facility included smart classrooms, multiple conference
rooms, lobbies, offices, a black box theater and the Communications
Arts and Language Lab (CALL). Within the CALL area are the
student newspaper, radio station, TV station and the language
lab. Responsibilities included acoustical, audio & video
system design.
Architect: SlaterPaull Architects
Denver, Colorado
|
Western State College Student Union
Pending LEED Gold Certification
Gunnison, Colorado
Facility included 200+ Seat auditorium, ballrooms, meeting
rooms, concourses, cafeteria and common student areas. Responsibilities
included auditorium acoustical, audio & video system;
theatrical lighting, drapery and rigging design.
Architect: SlaterPaull Architects
Denver, Colorado
|
Green Valley Ranch E-12
Pending LEED Silver Certification
Denver, Colorado
Facility to include 500+ Seat theatrical auditorium, student
commons area, special lecture and gymnasiums. Responsibilities
included auditorium, gymnasium, classroom, special lecture,
and commons acoustical, sound system; theatrical lighting,
drapery and rigging design.
Architect: DLR Group
Colorado Springs, Colorado
|
| Jefferson County Civic Center
LEED Silver Certified
Fairfield, Iowa
The design turns away from historic precedent and is cutting
edge, fully sustainable and refocuses the town of Fairfield
towards the future. Predetermined requirements from a state-awarded
grant added to the challenges of design, leaving no possibility
of reducing the square footage or seating requirements.
It was also important to the townspeople that the materials
and labor come from local sources to add to the town ownership
and pride in the project.
The Architect and design team was able to meet the program
by incorporating knowledge-based exterior wall construction
methods typically used overseas to increase building performance
and simplify construction.
The facility includes a 500 seat Fine Arts Concert Hall.
Geiler & Associates, LLC and Acoda Acoustics, LLC provided
acoustic design, performance lighting and drapery design
for a full fly system, audio & video system design,
sound isolation and mechanical noise and vibration control
design services.
Architect: Architectural Workshop
Englewood, Colorado
|
Academy 2 Charter School
Westminister, Colorado
Alta Vista School
Lamar, Colorado
Both Pending CO-CHPS Certification
Facilities include music rooms as well as classrooms,
conference rooms and offices. Responsibilities included
interior acoustics, sound isolation and mechanical noise
& vibration mitigation design.
Architect: SlaterPaull Architects
Denver, Colorado
|
|
|
|